Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
The proposed modification includes realignments of the treated water and brine pipelines, and relocation of the flow splitter structure / valve station.